{"id":10308,"date":"2020-10-20T08:30:00","date_gmt":"2020-10-19T23:30:00","guid":{"rendered":"https:\/\/ansaem.com\/?p=10308"},"modified":"2021-02-17T08:46:25","modified_gmt":"2021-02-16T23:46:25","slug":"%eb%86%92%ec%9d%b4-%ec%b0%a8%ec%9d%b4-8%eb%af%b8%ed%84%b0%ec%9d%98-%eb%95%85","status":"publish","type":"post","link":"https:\/\/ansaem.com\/en\/%eb%86%92%ec%9d%b4-%ec%b0%a8%ec%9d%b4-8%eb%af%b8%ed%84p1tbp%b01t1tp\/","title":{"rendered":"8 meters height difference"},"content":{"rendered":"<figure class=\"wp-block-image size-large\"><img data-recalc-dims=\"1\" loading=\"lazy\" decoding=\"async\" width=\"1080\" height=\"608\" src=\"https:\/\/i0.wp.com\/ansaem.com\/wp-content\/uploads\/2020\/10\/1769535660533961315.jpg?resize=1080%2C608&#038;ssl=1\" alt=\"\" class=\"wp-image-10309\" title=\"\" srcset=\"https:\/\/i0.wp.com\/ansaem.com\/wp-content\/uploads\/2020\/10\/1769535660533961315.jpg?w=1080&amp;ssl=1 1080w, https:\/\/i0.wp.com\/ansaem.com\/wp-content\/uploads\/2020\/10\/1769535660533961315.jpg?resize=480%2C270&amp;ssl=1 480w, https:\/\/i0.wp.com\/ansaem.com\/wp-content\/uploads\/2020\/10\/1769535660533961315.jpg?resize=768%2C432&amp;ssl=1 768w\" sizes=\"auto, (max-width: 1080px) 100vw, 1080px\" \/><\/figure>\n\n\n\n<p>Retaining walls must be installed, etc.<br>The height of the step is astounding, but<br>\u200b<br>Three-dimensional architectural approach<br>A land with endless possibilities.<br>\u200b<br>It seems bad<br>It seems good. Ground.<br>\u200b<br>Making the area limit by increasing the area.<br>\u200b<br>Contemplating how to adapt to the terrain in a stepped manner<br>\u200b<br>A method of converting civil engineering costs into construction costs<br>\u200b<br>Concerns about avoiding collision of viewing angles with adjacent buildings.<br>\u200b<br>Power is nothing without Control!<\/p>","protected":false},"excerpt":{"rendered":"<p>The height of the back step where the retaining wall should be installed is astounding, but there is endless possibility of three-dimensional architectural approach. One land. \u200bContemplating how to increase the area limit and adapting to the topography in a civil and stair way \u200bMethod of converting civil engineering costs into construction expenses Lee Go-min.<\/p>","protected":false},"author":6,"featured_media":10309,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_jetpack_memberships_contains_paid_content":false,"footnotes":""},"categories":[15,6],"tags":[1677,1676,210,69],"class_list":["post-10308","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-feng-shui","category-building-knowlege","tag-1677","tag-1676","tag-210","tag-69"],"jetpack_featured_media_url":"https:\/\/i0.wp.com\/ansaem.com\/wp-content\/uploads\/2020\/10\/1769535660533961315.jpg?fit=1080%2C608&ssl=1","jetpack_sharing_enabled":true,"_links":{"self":[{"href":"https:\/\/ansaem.com\/en\/wp-json\/wp\/v2\/posts\/10308","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/ansaem.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/ansaem.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/ansaem.com\/en\/wp-json\/wp\/v2\/users\/6"}],"replies":[{"embeddable":true,"href":"https:\/\/ansaem.com\/en\/wp-json\/wp\/v2\/comments?post=10308"}],"version-history":[{"count":0,"href":"https:\/\/ansaem.com\/en\/wp-json\/wp\/v2\/posts\/10308\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/ansaem.com\/en\/wp-json\/wp\/v2\/media\/10309"}],"wp:attachment":[{"href":"https:\/\/ansaem.com\/en\/wp-json\/wp\/v2\/media?parent=10308"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/ansaem.com\/en\/wp-json\/wp\/v2\/categories?post=10308"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/ansaem.com\/en\/wp-json\/wp\/v2\/tags?post=10308"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}