Project period: 2006
Project Name: Gangbuk English Village
Company in progress: A-Tech Construction
Responsibility: in charge of architectural design
Design overview
Site location: 82, Insu [Suyu 5/6-dong]-dong (san), Gangbuk-gu, Seoul
Building area: 3,231.04m² (977.39 pyeong, excluding experience building B)
Total floor area: 11,986.02m² (3,625.77 pyeong)
Building-to-land ratio: 29.67% (Excluding Experience Building B)
Floor Area Ratio: 69.75% (Excluding Experience Building B), Ground Floor Total Area: 7,595,54m²: Excluding Experience Building B, Shower Room)
Landscaping area: Legal area 3,396.7m²
규모 : 체험동A – 지하 1층 / 지상3층 | 체험동 B – 지상 3층
도서관 / 델리 – 지하1층 / 지상2층 | 숙소동 – 지하1층 / 지상 3층
설비 : 체험시설 – 전기구동형 히트펌프(EHP)
Accommodation and amenities: Fan coil unit
Number of parking spaces: 60 vehicles (2 parking spaces for the disabled), 60 vehicles
Height: 12m
Elevators: Passenger elevators: 2, Disabled-only elevators: 1
Exterior finish: THK 18 transparent double-layered glass, stucco brick, galvanized printed steel sheet, exterior insulation finish
Additional facilities: outdoor swimming pool, ecological experience center, physical education facility, walking trail