We will guide you through the necessary steps to build a house or building.
Construction proceeds through the following sequence.
- Securing the budget
(Check whether bank notes can be borrowed and whether it is possible to borrow mortgage of owned real estate) - House use
(House for large family or second house) Establishment - Choose your preferred structure
(Wood house, steel frame house, reinforced concrete, etc.) - Preferred architectural design form data search
(Recommended: Pinterest search) - Real Estate Listing Check
(Exploration and investigation of land for sale through real estate in the district where you want to build) - Whether the planned construction site affects the occupants or whether there are geographical problems in Feng Shui Confirm
(Identify whether there is any harm due to feng shui factors and whether there are any countermeasures) - Selected as an architect office
(Recommended places where Pengshuijiri and architectural design can be combined) - Surveying progress
(To prevent property damage due to area mismatch) - Real estate contract
(It is imperative to ask the architect for basic answers to the architectural design suitable for the site.) - Design contract progress
(It is necessary to find out whether roads can be secured and construction is possible) - Geological survey progress
(To determine the durability of the ground in the planned construction site and reflect the seismic design) - Conversation for a sufficient period of time and construction design meeting
(Consult the architect with the desired concept and family) - Determine whether the building to be built is in the shape of a building through architectural design drawings and models
(The final design must be decided through a fair with the family) - Construction license progress
(Major urban areas may be screened) - If there was an old building in the planned site, proceed to demolition
(Demolition proceeds after selecting a demolition company and selecting supervision) - Request for construction cost estimate
(Request for 3~4 quotations to select a construction company and contractor to proceed with the building construction) - Construction company selection
(Comparison of estimates and selection after judgment by visiting the building built by the corresponding construction company) - Selection of construction supervisor
(Recommended by the meticulous supervisor of the district rather than the building designer) - Report of start of construction
(Report of construction start through the documents submitted by the architect, the construction company, and the building owner) - Start of construction work
(가설공사 -> 토공사 -> 기초공사 -> 골조공사 -> 마감공사) - Preparation for completion inspection after completion
(Identify whether there is illegality or not, and whether it proceeds according to the design drawing) - Construction permit, completion inspection and special inspection
(Inspection through an architect assigned by the local district) - Completion of construction permit and interior progress
(Interior construction after completion) - Moving progress