Home blogArchitectural knowledge The standard for rebar construction and inspection

The standard for rebar construction and inspection

This is a picture of a Japanese building foundation.

It's 32 meters to put the file in.
Even if the building is small, this is the basic amount.

After that, the underground beam is connected
Seismic-resistance-related specifications are included.

Between these underground beams
Space is created
There is a passage through which sanitary pipes are connected.

Of course, except for some, they are allowed to enter.

A five-story building
This is the basis of earthquake resistance.

Only on-site reinforcement inspection on one floor
It is said to take 4 hours. .

In Korea, it takes only 5 minutes.

Power is nothing without Control!

Other posts in the category